The total cost of the studies in process amount to FF 1 874 674,57 or US$ 374 934,90 paid for by those who ordered these studies. The money received from pilgrims : FF 15 023,45 or US$ 3 004,60 is deposited at the Credit Agricole in Dozulé while awaiting the decision of the Church.
TECHSOL : electical soundings US$ 9,167.78 (VAT 18,6%)
CTICM : statics study US$ 27 278.00
CEBTP : geotechnical data US$ 6 546.72
CTICM : dynamics study US$ 13 046.00
CEBTP : stability of foundations US$ 10 937,05
CEBTP : determination of the excavation method US$ 2 372.00
3DD : scale model of the Cross US$ 12 237.16
INSTITUT DE SOUDURE : tubes, joints US$ 7 675.80
METEO FRANCE and IGN : weather data US$ 555,60
CEBTP & JOLY : topographical survey US$ 7 725.80
CEBTP 2 soil samples at 150m and 55m depth US$ 76 693,20
CEBTP 3 hydraulic borings US$ 53 434,20
CEBTP laboratory experiments US$ 85 156,60
University of WESTERN ONTARIO
Breakdown as follows :
Wind tunnel tests US$ 5 000,00
Building and testing of 3 scale models US$ 26 500,00
Verification of experiments US$ 20 000,000